Audley S7070-3 Installation Requirements | Central Print Supply

Audley equipment installation planning provided by Central Print Supply
Installation Requirements

Audley S7070-3 24 in 2-Head DTF Printer

DTF-60 ADL07K12 powder shaker included. Everything your site needs to be ready before delivery day.

Audley equipment installation guidance available through Central Print Supply.

2-Head Epson i3200 24 in Print Width RIIN / Flexi Software 220 V / 10 A Printer 220 V / 25 A Shaker
Audley installation pre-check visual for DTF printer site preparation

Mandatory Start-Up Consumables Policy

All Audley equipment orders through Central Print Supply must include the required start-up consumables listed on this page. Orders will not ship without the accompanying consumables package. This policy is mandatory with no exceptions. Missing consumables at installation and training dates is no longer acceptable. Dealers are responsible for ensuring the correct consumables are ordered alongside every machine.

Power & Software

Site Requirements

Software RIIN or Flexi
Printer Power 220 V / 10 A Dedicated breaker required
Shaker Power 220 V / 25 A Dedicated breaker required
Shaker Model DTF-60 ADL07K12
Required Supplies

Start-Up Consumables

The items below must be included with your machine order. Collection buttons open the relevant Central Print Supply contact or supply resources in a new window.

White Ink Note: Three bottles of white ink are required because white ink is consumed at a significantly higher rate than CMYK inks in DTF printing. This helps support initial training and early production without avoidable interruption.

Regular Cyan Ink, 1 L

SKU: 06.03.0003.0259

Regular Magenta Ink, 1 L

SKU: 06.03.0003.0260

Regular Yellow Ink, 1 L

SKU: 06.03.0003.0261

Regular Black Ink, 1 L

SKU: 06.03.0003.0262

Premium Japanese White Ink, 1 L Qty. 3

SKU: 06.03.0003.0173

24 in Double-Side 3-Sec Instant Hot Peel Film

SKU: 06.20.0001.0023

Fine Powder, 1 kg / 2.2 lb bag

SKU: 06.17.0001.0004

DTF Printhead Cleaning Solution, 100 ml bottle

SKU: 06.03.0007.0024

Shop Required Consumable Categories

Use collection-level links unless an exact SKU product URL has been confirmed.

Policy Purpose

Why This Policy Exists

Audley implemented the mandatory start-up consumables policy after repeated situations where the correct supplies were not on-site when a machine arrived. The result was delayed installations and shortened training sessions, outcomes that hurt dealers and their customers alike.

Having every required item in hand before your machine is delivered means your Audley technician can complete a full installation, run calibration, and deliver complete operator training on day one. Your team leaves confident and ready to produce.

FAQ

Frequently Asked Questions

Can I order consumables separately after the machine ships? No. Under the current policy, orders will not ship until the required consumables are included on the purchase order. Contact Central Print Supply to update your purchase order before shipment.
Why does white ink require 3 bottles? White ink is consumed at a significantly higher rate than CMYK inks in DTF printing because it forms the base layer on every print. Three bottles ensures you have enough supply to complete your initial training and early production runs without interruption.
What software do I need to install before delivery? The S7070-3 is compatible with RIIN RIP software and Flexi. The installation technician will assist with software setup and calibration during the installation visit.
Do I need a licensed electrician for the power requirements? Yes. Both the printer at 220 V / 10 A and the shaker at 220 V / 25 A require dedicated breakers. Central Print Supply strongly recommends having a licensed electrician verify and install the required circuits before delivery day.
Product names, model names, photographs, and manufacturer trademarks identify Audley equipment supported through Central Print Supply. Central Print Supply is an independent equipment dealer and should not be represented as Audley or as an Audley-operated regional office. Electrical, software, consumable, and installation requirements must be confirmed before delivery.